Facilities

Facilities

College Facilities

Davis College continues to celebrate the decision of the Department of Education and Skills to build a €9.7m, 5000 square metre extension that has more than doubled the size of the existing building and will radically transform the Davis College campus. In essence, the new building has become the heart of the school. The existing building has also undergone substantial investment with new flooring and painting throughout.

The PE department is to benefit substantially with the addition of a football pitch and outdoor court areas. Inside, their space is also set to increase as the existing Art room is to be converted in a multipurpose space for dance and exercise.

The new building itself contains Science laboratories, Construction and Engineering workshops, computer suites, two new Art rooms and two DCG suites and a library as well a series of general classrooms and resource rooms. In addition, there is a special need unit which will be a dedicated ASD support classroom. All rooms are fitted with short throw data projectors and computers. Completion of the project is due in April 2020 and will complement the existing facilities which include

  • 2 fully equipped computer rooms
  • 5 Science laboratories
  • 3 Woodwork rooms
  • 2 Metalwork rooms
  • 2 Drawing rooms
  • 2 Art rooms
  • 1 Full equipped Gym
  • 1 PE Hall
  • 1 Dance/Yoga studio
  • 2 Canteen area serving hot and cold food
  • 2 Home Economics room
  • 3 Resource rooms
  • 2 Music rooms
Nov 04
2024
School Reopens for all
Nov 07
2024
2nd Year Parent Teacher Meeting 3.30-6.00
Nov 18
2024
Autumn Assessments
Nov 18
2024
Transition Year Work Experience Week 1
Summerhill, Mallow, Co.Cork.
022 21173
Enquire
Location
© 2024 Davis College